SEALCOATING AND STRIPING

Sealcoating protects and extends the life of your asphalt by protecting the pavement from the elements while greatly improving its appearance. We offer several types of sealcoating products, one of which will meet your pavement's specific needs.

Sealcoating should only be performed under the proper weather conditions.

The recommended air and pavement temperature should be at least 55 degrees Fahrenheit and rising during sealer application and for 8 hours afterward.

Traffic should be kept off a newly sealed surface for a minimum of 18 to 36 hours to allow for drying (curing) time. If this   is not practical, Rose Paving will perform sealcoating in separate mobilizations to maximize convenience. It is also important to refrain from using sprinklers near the area, hosing down, or washing the area for 48 hours before and after work is completed.

Your parking lot isn't complete until the cars know where to park - and that requires line striping. We perform both line striping and other surface signage such as ADA parking symbols and parking stall stencils.